top of page
Lab Modifications



Overview + Key Features
The objective of this lab renovation was to standardize all equipment under a single provider, for improved efficiency and consistency. As part of the upgrade, our team removed existing HVAC systems, performed power and lab gas infrastructure enhancements, and installed a new electrical panel.
​Challenges
To ensure a successful outcome, our team quickly adapted to the unique power and programming requirements of the new equipment, learning the specific nuances needed for proper installation and operation.
​Solution
​To navigate the complex programming requirements, we collaborated closely with our team to ensure each piece of equipment was correctly configured and integrated into the lab environment.
End Result
The lab was successfully set up and is now fully operational, with all equipment properly installed and functioning as intended.
Project Details
Location
Boston, MA
Architect
OTJ​
Type
Construction Management
Engineer
BR + A
bottom of page
