Overview
This project involved installing a new dust collection system in an active GMP production environment. Through close coordination with the client, engineers of record, and local fire officials, the project was completed on schedule and on budget while meeting GMP requirements and minimizing disruption to ongoing operations.

Key Features

  • Installation of a new dust collection system serving a GMP production space, including integration with an existing inactive Fike system.

  • Management and installation of pre‑purchased equipment that had been stored prior to project start.

  • Close coordination with the client and the engineers of record (EOR) to finalize design requirements and complete installation.

  • Integration of a second Fike system into the building’s existing fire alarm infrastructure.



​Challenges

  • Navigating complex existing conditions to develop a layout that meets GMP and equipment requirements for all of the equipment within the space.

  • Designing, developing, and building a custom I/O rack to enable communication between the new dust collection system and the building’s BAS.

  • Ensuring the new Fike system—intended to be supervisory—could be integrated with a building that already had an active Fike system on the fire alarm panel.

  • Completing all coordinated work within a limited shutdown window for GMP production.

Project Details

Location

Seaport, Boston, MA

Design Partners

Optimal Industrial Automation

Type

Construction Management

Solution

  • Conducted extensive coordination to ensure all required offsets and spatial constraints were met for both new and existing equipment.

  • Einsteins collaborated with the client, and the EOR to successfully design and deliver a functional I/O rack enabling full BAS communication.

  • Worked jointly with the town’s Fire Department, EOR, and the client to integrate the second Fike system into the building’s fire alarm panel without disrupting existing life‑safety systems.

​

 

End Result

Einsteins, the client, and the EOR successfully completed the installation of the new dust collection system on budget, fully integrated with BAS and fire alarm systems, and aligned with GMP operational requirements.